![]() The Township of Union is comprised of multiple zoning districts, each with its own particular minimum home site, yard, and building requirements. converting a garage to an office/living space, an attic to a bedroom, or finishing a basement change of use - commercial, i.e. Zoning permits are also required for change of use - residential, i.e. When submitting the zoning permit, along with a plot plan or survey, provide the location and dimensions of all existing and proposed development including the area of the lot and proposed setbacks from property lines, including also designation of any trees to be removed. The Zoning Permit Application is also available at the Municipal Building. ![]() ![]() Zoning review is also required for the proper display of a residence address, tree removal, driveway installation, driveway alteration or paving, outdoor lighting signs, and alternative energy projects (i.e. Additions, alterations, swimming pools, decks, gazebos, garages, barns, permanent standby generators, roof mounted solar, and sheds of any size are just a few examples of construction requiring review. The first step is for the homeowner/property owner/tenant or agent to submit a Zoning Permit Application to the Zoning Office for project review/compliance with the Zoning Ordinances. ![]() ZONING AND THE PROPERTY OWNER: All construction activities require zoning review and approval before Construction Permits can be submitted to the DCA (State Department of Community Affairs). ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |